Supply Chain

Supply Chain · Halden & Rowe

Resilience is holding; distribution capacity is the pinch point for autumn.

Lead times are stable and inbound flow is on plan. Distribution capacity into the Bank Holiday and autumn transition is the single pinch point on the horizon.

Health · Healthy

Resilience holding across the network; one pinch point in distribution to plan for.

Metrics

Supply Chain at a glance

The readings a retailer would look at first.

Supply resilience

Stable

flat vs last week

No supplier at critical risk; two on watch.

Supplier risk

2 on watch

unchanged

One tier-two lead time drifting; one geographic exposure.

Lead times

42 days

up 1 day vs last month

Within tolerance; drift concentrated in one tier-two supplier.

Inbound flow

On plan

flat

No congestion at the primary gateway.

Distribution readiness

94%

down 1 pt

Peak-hour capacity constrained for the Bank Holiday period.

Network capacity

88% used

up 3 pts

Autumn transition peak will exceed threshold without action.

Geographic exposure

Contained

monitoring

One tier-two supplier concentrated in a single region.

Continuity

Rehearsed

quarterly review complete

Fallback routing options confirmed for peak weeks.

Summary

Supply Chain summary

Ana's editorial reading of the discipline this week.

The network is holding. Lead times are stable, inbound flow is on plan, and continuity plans have been rehearsed within the quarter.

The pinch point on the horizon is distribution capacity around the Bank Holiday weekend and the autumn transition. Adding a temporary shift or rerouting through the secondary hub closes the gap without disturbing standing operations.

Commercial impact

£220,000 of trading value is at risk if distribution capacity is not extended.

Adding a temporary shift for the Bank Holiday and autumn transition weeks protects availability and same-week delivery promises on the largest trading period of the quarter.

Executive actions

What to decide next

Ana's recommended next moves for this discipline.

Extend Bank Holiday distribution

Approve a temporary shift or reroute through the secondary hub to protect same-week delivery.

Owner

Supply Chain Director

Horizon

next 14 days

Progress supplier lead time review

One tier-two supplier is drifting; review the qualification alternative on file.

Owner

Supply Chain Director

Horizon

next 30 days

Reconfirm continuity routing

Fallback routing options are confirmed; brief the trading team for the peak weeks.

Owner

Supply Chain Director

Horizon

this month

Related

What lives behind Supply Chain

The canonical business objects surfaced through this discipline.